ALCOSAN
ALCOSAN Fluidized Bed Incinerator – Weld Repair Inspection

HRV provided a licensed Professional Engineer, AWS CWI inspectors, and Nondestructive Testing for this assignment.

HRV provided complete CWI services and witnessed fabricator QC UT and MT of welds during the fabrication of all superstructure steel by the Williams Bridge Company at their Richmond, VA, facility.
Bronx-Whitestone Bridge

HRV provided complete CWI services and witnessed fabricator QC UT and MT of welds during the fabrication of all superstructure steel by the Williams Bridge Company at their Richmond, VA, facility.

CONSOL Enery Center
CONSOL Energy Center (PPG Paints Arena)

In addition to providing CWI services, HRV also performed Non-Destructive Testing inspections on-site
and at the source supply locations for the Arena’s structural steel.

HRV provided third party inspection and testing services as a subconsultant to KS Engineers.
Goethals Bridge Replacement

HRV provided third party inspection and testing services as a subconsultant to KS Engineers.

HRV performed fabrication quality inspection services at numerous steel fabrication plants around the country. Inspections included built up girders, gear boxes and machine parts, elastomeric bearings, and miscellaneous bridge parts.
MassDOT Chelsea Street Bridge Replacement

HRV performed fabrication quality inspection services at numerous steel fabrication plants around the country. Inspections included built up girders, gear boxes and machine parts, elastomeric bearings, and miscellaneous bridge parts.

Under contract with MassDOT, HRV is currently performing fabrication quality inspection services at G&G Steel in Russellville, Alabama.
MassDOT Fore River Bridge Replacement

Under contract with MassDOT, HRV is currently performing fabrication quality inspection services at G&G Steel in Russellville, Alabama.

HRV is currently performing materials fabrication quality inspection for the new MassDOT Oak Bluffs Bridge in Oak Bluffs/Tisbury, Massachusetts.
MassDOT Oak Bluffs Bridge Replacement

HRV is currently performing materials fabrication quality inspection for the new MassDOT Oak Bluffs Bridge in Oak Bluffs/Tisbury, Massachusetts.

HRV is currently performing quality inspection of steel fabrication of built up girders, gear boxes and machine parts, elastomeric bearings, and miscellaneous bridge parts on the MassDOT Whittier Bridge.
MassDOT Whittier Bridge/I-95 Improvement Project

HRV is currently performing quality inspection of steel fabrication of built up girders, gear boxes and machine parts, elastomeric bearings, and miscellaneous bridge parts on the MassDOT Whittier Bridge.

HRV provides the Pennsylvania Department of Transportation (PennDOT) with quality assurance materials inspection services for highway and bridge construction projects.
PennDOT Statewide Steel and Materials Inspection

HRV provides the Pennsylvania Department of Transportation (PennDOT) with quality assurance materials inspection services for highway and bridge construction projects.

HRV provided periodic structural facility assessments including inspection of structural steel, precast and cast-in-place concrete, hand rails, gates and miscellaneous steel.
PNC Park

HRV provided periodic structural facility assessments including inspection of structural steel, precast and cast-in-place concrete, hand rails, gates and miscellaneous steel.

HRV is providing in-shop steel fabrication inspection of mechanical components at G&G Steel in
Russellville, Alabama.
MaineDOT Sarah Mildred Long Bridge Replacement

HRV is providing in-shop steel fabrication inspection of mechanical components at G&G Steel in
Russellville, Alabama.

HRV is currently performing fabrication inspection services at multiple shops throughout the U.S. and at the project site for the NYSTA Tappan Zee Bridge, one of the countries largest active infrastructure projects.
NYSTA Tappan Zee Bridge Replacement

HRV is currently performing fabrication inspection services at multiple shops throughout the U.S. and at the project site for the NYSTA Tappan Zee Bridge, one of the countries largest active infrastructure projects.

HRV provided steel fabrication inspection in the U.S. and at the China Railway Shanhaiguan Bridge Group facility located in China for the new Verrazano-Narrows Bridge (review of mill certifications, verification of weld procedures and welder qualifications, and visual weld inspection).
Triborough Bridge and Tunnel Authority Verrazano-Narrows Bridge

HRV provided steel fabrication inspection in the U.S. and at the China Railway Shanhaiguan Bridge Group facility located in China for the new Verrazano-Narrows Bridge (review of mill certifications, verification of weld procedures and welder qualifications, and visual weld inspection).

HRV has been awarded consecutive statewide contracts for inspection, sampling, and testing services for the Virginia DOT Materials Division.
Virginia DOT Statewide Inspection

HRV has been awarded consecutive statewide contracts for inspection, sampling, and testing services for the Virginia DOT Materials Division.

HRV provided CWI services and witnessed fabricator QC Ultrasonic Testing (UT) and Magnetic Particle Testing (MT) of welds during the fabrication of all superstructure steel for the Woodrow Wilson Bridge Rehabilitation project.
Virginia DOT Woodrow Wilson Bridge Rehabilitation

HRV provided CWI services and witnessed fabricator QC Ultrasonic Testing (UT) and Magnetic Particle Testing (MT) of welds during the fabrication of all superstructure steel for the Woodrow Wilson Bridge Rehabilitation project.

HRV is inspecting fabricated structural steel projects, performing and/or witnessing nondestructive testing of weldments at structural steel fabrication shops.
WVDOH Division of Highways, Statewide Materials Inspection

HRV is inspecting fabricated structural steel projects, performing and/or witnessing nondestructive testing of weldments at structural steel fabrication shops.